Garoll presents new casting unit
In order to fully automate the production process, the two presses are served by a robot which performs the following:
- simultaneous demoulding of 4 pieces by means of 4-cavity tools of suitable dimensions for the type of models installed;
- lateral hole punching of the cisterns using a tool equipped with pneumatic devices;
- punching of the holes located on the bottom of the cisterns using double-diameter tools.
The conveyor belt is sufficiently long to allow the pieces to reach an initial degree of drying necessary for the finishing operations. At the end of the plate conveyor, a second robot performs the following operations: upper seam fettling; sponging of the holes; automatic piece loading on boxes (or on cars or directly on a continuous dryer) for transport to the dryer.
Did you find this article useful?
Join the CWW community to receive the most important news from the global ceramic industry every two weeks
Recent articles
Beatrice Lucchese is the new CEO of Florim
May 27, 2026
New Machinery Regulation: the countdown begins
May 27, 2026
6th Freiberg Refractory Symposium 2026
May 26, 2026
Gruppo B&T and Digital Design at MDW26 with KANSO
May 25, 2026










