Cerdomus started up in the summer its new line in Castel Bolognese (Ravenna), equipped with Sacmi’s leading technologies, including the Continua+ PCR 2000.
The French company, which has been operating in the industry for no less than five generations, has installed a new Sacmi production line at its Decize factory in response to growing demand for technical stoneware mosaic.
The new player in the Nepalese ceramic industry will be able to satisfy at least a quarter of the country’s tile demand, which is currently met mainly by imports.
The facility is already under construction in Quebec and was designed together with Sacmi, which also built the fully electric roller kiln, a world first for this type of application.
The new lines (two PCR 2000’s and two PCR 2180’s) have already been shipped and will soon begin operation at the New Pearl plant in Sanshui to produce slabs and coordinating sub-sizes.
With this complete plant for the production of high-end large-format tiles, the company aims to strengthen its position in the domestic and international markets.
Sacmi has now installed 260 machines worldwide, a milestone that demonstrates the efficiency and versatility of Sacmi RobotCasting high pressure casting.
The Rumanian tableware manufacturer has started up a new Sacmi spray-dryer ATM18 that will allow to carry out part of their spray-dried powder production vertically and to completely recycle scrap and waste within the line.
The solution enables the Civita Castellana-based company to automate white finishing of sanitaryware. The supplied cell is equipped with the new Sacmi-Gaiotto NG Offline software and a customised handling system.
The company recently installed a new Sacmi-Gaiotto GA2000 robot equipped with the new anti-bacterial kit for efficient, uniform application of sanitising glaze.
The new kiln came into operation in April, completing the investment plan at the Peronda 2 plant initiated in 2017 with the start-up of a Continua+ line for slab production.
A new plant is due to come into operation at the site in Baxter, Tennessee this spring. It will focus on the production of large sizes and trims, products that are in strong demand in the US market.
The project began in 2022 with the installation of a new kiln and has now been completed with the start-up of the first Continua+ line, with capacity soon set to double.
An IT architecture that keeps the key production parameters of casting, glazing and robotic finishing under control, all in real time. With immediate advantages thanks to proactive, instantaneous process management.
A major technological modernization plan has now been implemented with a new Sacmi dryer and modular mill, resulting in a more sustainable and efficient management of different products and sizes.
Large sizes, with complete plant engineering solutions and innovative technology for slab decoration, to take center-stage at the Coverings fair in Orlando (FL).
Be the first to know!
Get the most useful and interesting news from the global ceramic industry in your inbox every two weeks